Outstanding tree planting on Beach Rd is programmed for February 2023. High Street, Clifton Road, Beach Road, Duke Street work areas have been re-opened post-Christmas, with paving works continuing to completion on Beach Road. 21 February 2023īeach Road, East Street, Clifton Road, Duke Street and High Street works are now complete, although some remedial works and cleaning are happening. No further disruption is planned as a result of the work. Parking enforcement will start again on 27 February across all areas listed. These works will be completed in September 2023. Phase 1 works (Terminus Road) continue to schedule. All these works will be undertaken over the coming months, but are not expected to cause any disruption to pedestrians or traffic. Additional funding from UK Prosperity Fund has enabled us to deliver a further 22 cycle stands, an extra bench, additional signage, tree pots for Beach Road and one on the High Street to replace trees that could not be planted due to underground services and lighting to the clock tower. Works to the High Street and surrounding area are now complete. Phase 1 works (Terminus Road) continue to schedule. These works will be completed in September 2023. Works to the High Street and surrounding area are now complete. An additional 22 cycle stands, an extra bench, additional signage, and lighting to the clock tower are now all installed, the tree pots for Beach Road and one on the High Street will be installed in June. The Clock Tower lighting is being installed imminently, new tree pots will be installed in June. Terminus Road works are progressing to programme and works around the station are due to commence in June. Phases 2&3 are fully complete and Terminus Road works will be completed by 6 th August, with the exception of the resurfacing works, which will require a full road closure for 2 weekends (16/17 September and 23/24 September).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |